NZ Post Distribution Centre

Redevelopment of the existing Steel and Tube building with an addition of 6,500m2 to enable internal bulk unloading of mail from the NZ Post Haulage Fleet. The 3,700m2 internal space was repurposed for mail sorting equipment, with the largest suspended ceiling installed in Palmerston North. Other work included new offices, training and cafeteria spaces.

Completed 2015